| year of realisation | reference name a subject / subject matter of the order; car rated load of car-hearth furnaces, charge weight of chamber furnaces, capacity or another specific equipment parameter | fuel | country |
| 2006 | Revamping and extension of the glass cooling furnace / delivery + erection, incl. el.part; | gas | CZ |
| 2006 | Revamping of the car-hearth furnace for heat treatment of plates and blocks / complete revamping including disassembly, delivery, erection, commissioning; only part of steel structure from the original furnace was used ; 200t | gas | F |
| 2006 | Horizontal continuous furnace for drying the transformer plate strip after coating with insulation layer / project, complete delivery, supervision erection, commissioning; | electricity | CZ |
| 2006 | 6 pcs recuperators for bell furnaces / Delivery (spare parts of ŠKODA furnaces); | for gas furnaces | CZ |
| 2006 | Vertical continuous two-loop furnace for heat treatment of the copper plate strip with width of 1,000 mm in the pickling and polishing line (max. line speed 10m/min.) / project, complete delivery including erection and commissioning; | elektricity | CZ |
| 2006 | Walking beam furnace 2.2t/hr for heating the bars before rolling the precise profiles for car industry / project, complete delivery of the furnace and material sorting, including erection and commissioning; 22 t/hr | gas | CZ |
| 2006 | Car-hearth annealing furnace 3.5 x 5 x 3 m / project, complete delivery incl. erection and commissioning; 160t | gas | I |
| 2006 | Roller-hearth furnace for annealing of tubes made from special carbide-nickel steels in 100% hydrogen atmosphere / project, complete delivery incl. erection and commissioning; furnace length 198m | electricity | CZ |
| 2006 | Revamping of the heating system in the car-hearth annealing furnace - change from coke-oven gas to natural gas / project, complete delivery incl. erection and commissioning; | gas | CZ |
| 2006 | SKE 1200 low-pressure combustion chamber for the china-clay grinding line / project, complete delivery incl. erection and commissioning; | gas | CZ |
| 2006 | Visualisation system of the operating parameters of the rotary-hearth furnace / SW ; | gas | SK |
| 2006 | SW adaptation of the control system for two car-hearth annealing furnaces / SW ; | gas | SK |
| 2007 | Delivery, assembly and debugging of the complete electric equipment and control system of GHW cupola furnace / delivery+assembly+control system+SW, including commissioning; | coke/CO | CZ |
| 2007 | Equipment for heating the hammer swages / delivery + assembly; | gas | SK |
| 2007 | Line for controlled cooling of special forgings / delivery and supervision assembly; | air/water | India |
| 2007 | Car-hearth annealing furnace 4 x 14 x 3.5 m / project, complete delivery including erection and commissioning; 450t | gas | I |
| 2007 | Relocation of ASEA ladle heating / disassembly, modification, assembly; | gas | CZ |
| 2007 | Equipment for foundry ladle heating of the Peugeot engine piston rings / project, complete delivery including assembly and commissioning; | gas | CZ |
| 2007 | Supply and assembly of the gas-tight inlet and outlet closures for the annealing furnace in the decarburization line / project, complete delivery including assembly and commissioning; | for el. furnaces | CZ |
| 2007 | Chamber heating furnace 5 x 4.2 x 2.6 m with regenerative heating / project, complete delivery including erection and commissioning; 60t | gas | I |
| 2007 | Revamping of BTU continuous furnace (production of electric components) / project, complete delivery including erection and commissioning; | electricity | CZ |
| 2008 | Car-hearth annealing furnace 4 x 14 x 3.5 m / project, complete delivery including erection and commissioning; 450t | gas | I |
| 2008 | SKE combustion chamber of 7.5 MW / project, complete deliverey including supervision erection and commissioning; | light fuel oil | Kazakhstan |
| 2008 | Revamping of the car-hearth heating furnace 3.5 x 9.2 x 2.5 m, regenerative heating / project, complete revamping incl. building part, erection and commissioning; 170t | gas | CZ |
| 2008 | Furnace for heat stabilisation of shafts to 60t and 10m / project, complete delivery incl. evaluation SW, erection and commissioning; | electricity | I |
| 2008 | Bell furnace for heat-treatment of small steel car parts in the protective atmosphere / project, complete delivery incl. erection and commissioning; | gas | CZ |
| 2008 | Furnace set (drying-preheating-annealing-flattening-cooling) for thermo-flattening & coating line of the transformer plate in the protective atmosphere / project, complete delivery incl. erection and commissioning; | gas/electricity | CZ |
| 2008 | Revamping of the car-hearth heating furnace 5.9 x 13 x 3 m, regenerative heating / project, complete revamping including disassembly, erection and commissioning; 460t | gas | CZ |
| 2008 | Revamping of the furnace for heat stabilisation of the shafts; equipment for measurement and evaluation of the shaft radial run-out during the stabilisation / project, complete revamping incl. disassembly, erection, evaluation SW and commissioning; | electricity | CZ |
| 2009 | Car-hearth annealing and heating furnace up to 1,300°C (multi-purpose furnace) 4 x 22 x 3 m with charge controlled cooling / project, complete delivery incl. project for builidng permit, building part, erection and commissioning; 490t | gas | CZ |
| 2009 | Chamber heating furnace 5 x 4.8 x 2.6 m with regenerative heating / project, complete delivery including erection and commissioning; 60t | gas | I |
| 2009 | Car-hearth annealing furnace 4 x 14 x 3.5 m, with extension module of 18 m / project, complete delivery including erection and commissioning; 450t (option 570t with extension module) | gas | I |
| 2009 | Automatic tunnel two-row furnace for drying the glas fibres (filtered air environment) / project, delivery of heating, exhaust and circulating system of the drying air, erection and commissioning; 4200t/year | gas | Latvia |
| 2009 | Revamping of car-hearth annealing furnace 4 x 6 x 2.5 m / project, complete reconstruction incl. disassembly, erection and commissioning; 160t | plyn | I |
| 2009 | Car-hearth annealing furnace 2.5 x 8 x 2.5 m / project, delivery of completing parts, supervison erection; 160t | LPG | India |
| 2009 | 3 pcs chamber heating furnaces 5.6x6.5x3.4 m with regenerative heating in the rotating forging line (attended by rail manipulators) / project, complete delivery including erection and commissioning; 80t/furnace | gas | I |
| 2009 | Car-hearth heating furnace 7.9 x 8 x 3.5 m with regenerative heating / project, complete delivery including erection and commissioning; 100t | gas | I |
| 2009 | Chamber heating furnace 5.6x4.5x3.4 m with regenerative heating / project, complete delivery including erection and commissioning; 80t | gas | I |
| 2009 | Gas inter-operation heating and reheating of weldments and castings (several shops) / documenttion, complete delivery including assembly and commissioning; | gas | CZ |
| 2009 | Car-hearth annealing furnace 4 x 14 x 3.5 m / project, complete delivery including erection and commissioning; 450t | gas | I |
| 2010 | Car-hearth heating furnace 3.5 x 7.5 x 2.5m with burners with flat flame / project, complete delivery including erection and commissioning; 150t | gas | I |